{"product_id":"avanos-medical-el-2mtp-lead-set-2ft-long-lead-sets-two-2-sizes-1-ea","title":"Avanos Medical-EL-2MTP Lead Set, 2ft, Long Lead Sets, Two (2) Sizes (1 EA)","description":"\u003cp data-path-to-node=\"2\"\u003eThe Avanos Medical EL-2MTP Lead Set is a specialized connecting cable designed for use with nerve stimulators during regional anesthesia and neuromuscular monitoring procedures. Measuring 2 feet in length, this extension lead set features dual connector options to interface seamlessly with multiple electrode pin sizes. Engineered for dependable electrical signal transmission, its durable insulation and heavy-duty strain relief ensure consistent performance in high-turnover operating rooms, ICUs, and surgical centers.\u003c\/p\u003e\n\u003cdiv class=\"horizontal-scroll-wrapper\"\u003e\n\u003cdiv class=\"table-block-component\"\u003e\n\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\u003c!----\u003e\n\u003ctable data-path-to-node=\"3\"\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cstrong\u003eSKU\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e\u003cstrong\u003eProduct\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd\u003e\u003cstrong\u003eKey Technical Details\u003c\/strong\u003e\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003e\u003cspan data-path-to-node=\"3,1,0,0\"\u003e\u003cb data-path-to-node=\"3,1,0,0\" data-index-in-node=\"0\"\u003eAvanos Medical\u003c\/b\u003e-EL-2MTP\u003c\/span\u003e\u003c\/td\u003e\n\u003ctd\u003e\u003cspan data-path-to-node=\"3,1,1,0\"\u003eLead Set, 2ft, Long Lead Sets, Two (2) Sizes (1 EA)\u003c\/span\u003e\u003c\/td\u003e\n\u003ctd\u003e\u003cspan data-path-to-node=\"3,1,2,0\"\u003e2 ft length, dual size tip compatibility, non-sterile, reusable\u003c\/span\u003e\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003cdiv class=\"table-block has-export-button new-table-style is-at-scroll-start is-at-scroll-end\"\u003e\n\u003cdiv class=\"table-content\" data-hveid=\"0\" data-ved=\"0CAAQ3ecQahgKEwiRsLm2nuGVAxUAAAAAHQAAAAAQ5wI\"\u003e\u003cbr\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e","brand":"Avanos Medical","offers":[{"title":"Default Title","offer_id":50044529869040,"sku":"Avanos Medical-EL-2MTP","price":201.9,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0723\/6429\/4384\/files\/A130699.jpg?v=1784562536","url":"https:\/\/vigourmedstore.com\/products\/avanos-medical-el-2mtp-lead-set-2ft-long-lead-sets-two-2-sizes-1-ea","provider":"Vigour Med Store","version":"1.0","type":"link"}