Avanos Medical-EL-2MTP Lead Set, 2ft, Long Lead Sets, Two (2) Sizes (1 EA)

  • SKU: Avanos Medical-EL-2MTP
  • SKU: Avanos Medical-EL-2MTP
  • Condition: Brand New 
  • Warranty: Manufacturer's Warranty
  • MPN: EL-2MTP
  • Est. Delivery: 10 to 14 Days
  • Country of origin: USA
  • Shipping: Calculated at Checkout
  • MPN: EL-2MTP
  • Est. Delivery Date: Nov 10 to Nov 24

Precio:
Precio de venta$201.90 Precio habitual$321.90

Gastos de envío calculados en la caja

Stock:
Disponible

Descripción

Features

  • Dual-Size Design: Connects to various needles and electrodes.
  • 2-Foot Length: Tangle-free signal routing in close range.
  • Reliable Conduction: Delivers uniform current for precise tracking.
  • Durable Insulation: Built to endure handling and disinfection.
  • Latex-Free: Safe for latex-sensitive patients and staff.

Specifications

  • Product Type: Nerve stimulator lead set
  • Cable Length: 2 feet (0.6 meters)
  • Connector Configurations: Two (2) connection sizes
  • Sterility: Non-Sterile
  • Usage: Reusable
  • Compatibility: Standard nerve stimulators and monitoring units
  • Prescription Status: Rx Required
  • Product Weight: 0.18 lb
  • Packaging Unit: 1 unit per box

Configurations

  • Avanos Medical-EL-2MTP: 2ft Lead Set, Two (2) Connector Sizes, Non-Sterile (1 EA)

También te puede interesar

Visto recientemente