Graham Field-GL927100 Maxi-Rest Deluxe Plastic Rails (1 PR)

  • SKU: Graham Field-GL927100
  • SKU: Graham Field-GL927100
  • Condition: Brand New 
  • Warranty: 1 Year
  • MPN: GL927100
  • Est. Delivery: 7 to 10 days
  • Shipping: Calculated at Checkout
  • MPN: GL927100
  • Est. Delivery Date: Nov 19 to Dec 05

Price:
Sale price$727.65 Regular price$858.63

Shipping calculated at checkout

Stock:
In stock

Description

Features

  • Deluxe Plastic Material: Provides a more comfortable, non-institutional feel.
  • Full Assembly Set: Includes both Left-Hand (LH) and Right-Hand (RH) rails.
  • Bariatric Support: High-impact construction designed for heavy-duty use.
  • Easy-Clean Surface: Non-porous plastic stands up to rigorous disinfection.
  • Ergonomic Grip: Shaped to assist patients with repositioning and egress.
  • Secure Mounting: Specifically engineered for the Maxi-Rest bed frame slots.
  • Enhanced Safety: Full coverage design reduces the risk of accidental falls.
  • Modern Aesthetic: Matches contemporary clinical room designs.

Specifications

  • Material: High-Impact Clinical Grade Plastic
  • Finish: Textured Ergonomic Surface
  • Application: Bariatric Beds (Maxi-Rest Series)
  • Leadtime: Extended / Long Leadtime Item
  • Sterility: Non-Sterile
  • Packaging: 1 Pair (LH/RH)
  • Weight: 30 lb

Configurations

  • GL927100: Maxi-Rest Deluxe Plastic Rails, Left & Right Assembly: 1 PR

You may also like

Recently viewed